Public Construction


 

I-94 North-South Freeway Project
Includes Ryan Road Interchange Reconstruction
Wisconsin DOT Project
Late October 2017 thru Fall 2018

The Wisconsin Department of Transportation (WisDOT) continues to reconstruct the I-94 North-South corridor from the Mitchell Interchange in Milwaukee to the Illinois State line.  The project is expanding the interstate to 4 lanes in each direction and redesigning 17 interchanges.  As part of this project, the Ryan Road Interchange will now be reconstructed.  Work is scheduled to begin in late October 2017 and run through mid-fall 2018. 

Visit https://projects.511wi.gov/i94northsouth for complete project information or
https://projects.511wi.gov/i94northsouth/ryan-road-interchange/ specifically for the Ryan Road Interchange Reconstruction portion. 

Please see below "Project Brief" updates from WisDOT for the Ryan Road Interchange reconstruction phase of this project for closures and "what to expect" details.

4/3/2018:  Closure schedule for girder setting operation occurring Monday, April 9th, and Tuesday, April 10th:
                 Monday, April 9th, Setting Girders over IH 94 SB
                 Full closure of IH 94 SB (10:30 p.m. to 5 a.m.)
                 Two left lanes closed on IH 94 NB (9:30 p.m. to 5:30 a.m.)
                 EB Ryan Road closed at 20th Street (10 p.m. to 5 a.m.)
                 WB Ryan Road closed at 13th Street (10 p.m. to 5 a.m.)

                 Tuesday, April 10th, Setting Girders over IH 94 NB
                 Full closure of IH 94 NB (10:30 p.m. to 5 a.m.)
                 Two left lanes closed on IH 94 SB (9:30 p.m. to 5:30 a.m.)
                 EB Ryan Road closed at 20th Street (10 p.m. to 5 a.m.)
                 WB Ryan Road closed at 13th Street (10 p.m. to 5 a.m.)

1/24/2018 Announcement:  Ryan Road from 20th Street to 13th Street will be closed from 11 p.m. to 8 a.m. on Friday, January 26, 2018.  All entrance/exit ramps to/from I-94 will be closed from 10:30 p.m. to 8 a.m.  This work is to remove and replace several areas of deteriorating asphalt.
11/29/2017 Announcement:  Ryan Road Park & Ride Closing 12/3/2017

Fall 2017 Project Brief: Ryan Road Interchange Reconstruction Update
 
 

------------------------------------------------------------------------------
 


1.  Planning, surveying, and design for new, reconstructed and resurfaced:

    • Streets
    • Sidewalks
    • Driveway Approaches
    • Public Parking Lots

2.  Planning, surveying, and design for relay, repair, extension and relining
     of:

    • Storm Sewers
    • Sanitary Sewers

3.  Planning, surveying, and design for: 

    • Water Relays
    • Water Main Extensions

4.  Planning and design for installation of:

    • Street Lighting
    • Traffic Lights
    • Traffic Signs

5.  Planning, permits, and design of drainage for:

    • Properties
    • Retention and Detention Ponds
    • Stormwater Run-off
    • Land Disturbance

 

Engineering Department
9229 W. Loomis Road
Franklin, WI  53132

Phone:  414-425-7510
Fax:  414-425-3106

Hours:  M-F, 8:30 a.m. to 5 p.m.

Glen Morrow, P.E., City Engineer

Sara Arnold, P.E., Assistant City Engineer
 

________________________________


Related Links

Board of Public Works
Board of Water Commissioners
Plan Commission